Towed artillery. Towed Artillery: Artillery Systems Project Team requires 150 x Muzzle Velocity Radar (MVR) units to be built and delivered. They will need to be integrated successfully with the Linaps system situated on the L118 Light Gun. A period of 3 years logistic support will also be required following delivery.