Dismantling and disposal of existing systems, supply air and exhaust air. Dismantling, transport in the E-1 to the entry opening, removal with a truck crane into a container. Clipping and disposal of existing BSK. Installation of sewer network and new BSK on existing systems. Unclamping / programming the old BSK and switching on and programming the new BSK and ULKG in the SAUTER ASP and on the SAUTER GLT. Execution in medically used areas of the Elblandklinikum Radebeul.
Air duct, rectangular, tightness class C DIN EN 1507, pressure class 2 DIN EN 1507, made of galvanized steel, folded, dimensions DIN EN 1505, edge length up to 500 mm, ... 86 m
Air duct, rectangular, tightness class C DIN EN 1507, pressure class 2 DIN EN 1507, made of galvanized steel, folded, dimensions DIN EN 1505, edge length over 500 to 100 mm, ... 29 m
Form piece for air duct, rectangular, airtightness class C DIN EN 1507, pressure class 2 DIN EN 1507, made of galvanized steel, folded, dimensions DIN EN 1505, edge length up to 500 mm, ... 192 m
Ceiling swirl diffuser, air jet not adjustable, for installation in closed ceilings, square front panel, with fixed blades, color "RAL 9010", nominal size 400, ... 11 items
Decommissioning of existing air conditioning systems, electrical activation and disconnection of the connected media in coordination with the MSR trade and / or the technical manager / house technician on site, if necessary emptying the connected heat exchangers. Emptying and dismantling of the hydraulic connection groups to the main line / distributor and closing with caps. 6 pcs.