The contract consists of renovation works in the stations of Bockstael (L50) and Boondael (L26), and it is divided into two lots.
Renovation of Bockstael Railway StationLOT 1 concerns Bockstael Station and consists mainly of:
• Raises docks to 75cm
• Track ripping
• Awning "multimodal pole" on Boulevard E. Bockstael
• Installation of two elevators along the E. Bockstael Boulevard Bridge with access landings
• Installation of two new stairs accessible from the E. Bockstael Boulevard Bridge
• Replacement of the two stairs rue Léopold I
• Closure of the existing CSV (with continued access to the technical rooms)
• Closure of the current access staircase from E. Bockstael Boulevard
• Renewal of finishes (floors, walls, ceilings), lighting and dock equipment (including sound system, access control and cameras)
• Installation of bicycle shelters on rue du Champ de la Couronne
• Adaptation of the retaining wall
• Renewal of hydraulics
• Rehabilitation of the embankment area along the quays (fencing/planting/repair of the perré)
Renovation of Boondael StationLOT 2 concerns the Boondael station and consists mainly of:
• Ripping of tracks and catenaries
• Raises the quays to 75cm, extends the quays to 265m and adapts the road accesses
• Replacement of the two stairs Avenue de la Forêt
• Installation of two new stairs Chaussée de Boitsfort
• Creation of two PRM ramps
• Replacement of passenger shelters with awnings
• Renewal of finishes, lighting and dock equipment (including sound system, access control and cameras)
• Installation of bicycle shelter
• Hydraulics: infiltration basins in the quays
• Rehabilitation of embankments along the quays (fencing/planting)