Volumes of construction works:
Construction of a new reinforced concrete sewage pumping station — building area 650 m
Construction of reinforced concrete channel 2 500 x 1 800 mm – total 161,5 m, construction of GRP sewage gravity pipe DN1600 mm – total 21 m, construction of 2 pcs steel sewage pressure pipes OD1422 mm – total 271 m, construction of transformer substation.
Dismantling of the existing sewage pumping station.
Reconstruction of gas supply, dismantling of existing gas supply – total 40 m.