As part of the implementation of the 2020 heating strategy, Stadtwerke Greifswald is planning to build a combined heat and power plant and to build an innovative combined heat and power plant (iKWK). As part of the overall project, 2 CHP modules, an electric boiler of approx. 5 MW each in a new building to be erected, a heat storage with 200 MWh capacity and a solar thermal system with approx. 17,000 m
Manufacture of the outside facilities around the CHP building. This includes the manufacture of the streets, paths and green areas, a fire water cistern, oil separator, tank, dirt and rainwater pipes, trenches for other trades and street lighting.