Contract Value:
-
Notice Type:
Contract award notice – utilities
Published Date:
21 June 2023
Closing Date:
Location(s):
UKN06 Belfast (UK UNITED KINGDOM)
Description:
VT3 Phase 3 A & B - Civil Engineering Works Contract

The successful bidder shall supply, construct, and install all permanent works and all associated temporary works within an operational container terminal ("Works").

Please note that these works will be sequenced in 7 Phases and shall take place within an operational container terminal

The Works will include the following;

• Liaising, coordinating and co-operating with Irish Continental Group to ensure the Works are carried out in a safe manner within the operational terminal and cause as little disruption as possible to the ongoing operations.

• Laying of approximately 9,200m2 of pavement quality concrete

• Laying of approximately 7,928 m2 of hot rolled asphalt

• Laying of approximately 10,600m2 of gravel surfacing

• Installation of 450m of heavy-duty storm slot drains

• Installation of all other associated storm drainage

• Construction of 4nr reefer towers with piled foundations

• ISPS boundary and internal paladin fencing and gates

• Estimated programme for the works is 80 weeks

• M&E Services including HV and LV power networks, lighting, data connections and all associated civil engineering works including, ducting and chambers.

• Approximate length of HV cabling: 1350m

• Number of reefer towers to be connected: 4

The Works will include the following;

• Liaising, coordinating and co-operating with Irish Continental Group to ensure the Works are carried out in a safe manner within the operational terminal and cause as little disruption as possible to the ongoing operations.

• Laying of approximately 9,200m2 of pavement quality concrete

• Laying of approximately 7,928 m2 of hot rolled asphalt

• Laying of approximately 10,600m2 of gravel surfacing

• Installation of 450m of heavy-duty storm slot drains

• Installation of all other associated storm drainage

• Construction of 4nr reefer towers with piled foundations

• ISPS boundary and internal paladin fencing and gates

• Estimated programme for the works is 80 weeks

• M&E Services including HV and LV power networks, lighting, data connections and all associated civil engineering works including, ducting and chambers.

• Approximate length of HV cabling: 1350m

• Number of reefer towers to be connected: 4

Awarded to:
McGaffin Contracts, Belfast (UK)
Download full details as .pdf
The Buyer:
BELFAST HARBOUR COMMISSIONERS
CPV Code(s):
45241000 - Harbour construction works