The new Ålgård church
A new and modern church is planned for Ålgård. The church building constitutes of two floors totaling 1 550 m2 and is planned as a signature building for the city centre and shall accommodate diverse activities.
The congregation is therefore working with a possible extension of the basement with approx. 400 m2 for children and youth activities. The framework has been ordered and their shall be given price options for the future establishment of the expansion.
The building plot situation: The church shall be built on a plot next to the old church in Ålgård city centre. The plot is against the churchyard.
The excavation work is scheduled to start in the summer of 2013 with the completion of the church building within 2014.
Norconsult is engaged as the site manager. The works are to be implemented by builder controlled contracts.
Expected division of contracts (i.e. approx. 15 contracts)
1. Site labourer
2. Outdoor facilities
3. Concrete and steel works
4. Laminated wood construction (incl. supplier pre fabrication)
5. Timber works, facade / skylights, tinsmith works, interior tile work
6. Roofing works
7. Painting and floor and wall coverings
8. Sanitation works, hydronic heating / heating pump
9. Ventilation works
10. Electrical works – heavy current, lighting, Electrical works – low current
11. automatization, central control facility
12. Sound system
13. Stage lighting system
14. Furniture for the sanctuary
15. Lift
Roofing works:
There are 2 different roof constructions on the building:
- The church building
- The roof over the expansion of the basement (the ceiling is situated underground, green roof)
On the church building there is planned a building roofing layer of asphalt, directly on the roofing boards. This will also function as a vapour barrier. The insulation will be made out of 250 mm mineral wool. The roofing will also be based on asphalt, but must have a white top layer on the basis of architectural considerations.
The roof over the expansion consists of a construction layer of asphalt directly on concrete. This will also act as a vapor barrier. The roof structure is planned as a dual roof or a inverted roof, the insulation is (partly) over a waterproof membrane. For this reason the insulation is made up of XPS. The waterproof membrane is planned as asphalt base and is located between two layers of insulation. The air drop of the membrane is formed by slanted cut isolation. Because of poor elevation the insulation over the membrane must also be cut at a slanted angle.
All of the construction parts located over the last insulating layer is described in the contract "outdoor facilities".