Measure: New construction of laboratory and office building 50.15 IEK-12, Helmholtz Institute Münster
Service: Metal construction work façade (windows, glazing, exterior doors)
The new HI MS 2 building is located on the grounds of the Westfälische Wilhelms-Universität Münster on the building plot of the existing battery research center MEET in Corrensstraße 46a
Power:
• Element window plastic-aluminium: approx. 615 m²
• Aluminium windows: 6 pcs or approx. 50 m², of which 4 pcs or approx. 30 m² curved in floor plan
• Aluminium PR façade: approx. 43 m², with 1 door element, of which 1 segment of 11 m² curved in plan
• External doors as aluminium frame doors: 3 pcs
• Anti-glare roller blind: approx. 438 m²
• Partial darkening as surface curtain: approx. 33 m²
• Partial darkening as surface curtain, round: approx. 63 m²
• Glare protection as a panel curtain, round: approx. 9 m²
• External sun protection as venetian blinds: approx. 480 m²
• Drywall work: wall tapers with sheet metal cladding following window elements of the contractor: approx. 40 m
• Element window plastic-aluminium: approx. 615 m²
• Aluminium windows: 6 pcs or approx. 50 m², of which 4 pcs or approx. 30 m² curved in floor plan
Power:
• Aluminium PR façade: approx. 43 m², with 1 door element, of which 1 segment of 11 m² curved in plan
• External doors as aluminium frame doors: 3 pcs
• Anti-glare roller blind: approx. 438 m²
• Partial darkening as surface curtain: approx. 33 m²
• Partial darkening as surface curtain, round: approx. 63 m²
• Glare protection as a panel curtain, round: approx. 9 m²
• External sun protection as venetian blinds: approx. 480 m²
• Drywall work: wall tapers with sheet metal cladding following window elements of the contractor: approx. 40 m
Deadlines for commencement and completion of the service (= execution periods):
Execution begins
Start Montageplanung: 25.10.2023
Start Montage: 24.04.2024
The service is to be completed (to be completed ready for acceptance)
End of assembly: 21.08.2024