This contract is included in Preparatory Works and comprises work to prepare for a new construction pit for building J.
- Demolition along the eastern facade of building E1
- Demolition along the southern facade of building D1
- Service pavilion
- Demolition of the tower in building B
- Demolition along the western facade of building B1
- Forecourt
Click https://permalink.mercell.com/211326697.aspx
This contract is included in Preparatory Works and comprises work to prepare for a new construction pit for building J.
- Demolition along the eastern facade of building E1
The bicycle shelter consists of steel supports for the glass roof and foundations. It will be completely demolished.
- Demolition along the southern facade of building D1 The pipeline shaft will be demolished in its entirety. The shaft runs from ground level down to the basement floor on level U1.
- The service pavilion (library, hairdresser, LMS and café) will be demolished in its entirety.
- Demolition of the tower in building B
The entire tower will be demolished down to the current roof surface on level 05 for Building B, and the part of the tower that protrudes beyond the façade of Building B will also be demolished down to the surface terrain (see figure 3 below). This affects all floors in the existing buildings. The tower has a function in relation to the stability of building B, so measures will have to be taken in connection with the tower. Demolition (bracing structures).
- Demolition along the western facade of building B1
The canteen pavilion must be completely demolished. In addition, the adjacent terrace must also be removed. See Figure 4 below. The building is located above the basement car park.
- Forecourt
All technical engineering on the surface north of the green line in Figure 6 below, towards the fence to 7010, will be demolished. Removal and temporary storage of art and paving stones are options.