Description:
Carpenter and timber construction, Allermöher Deich 36

GMH | Gebäudemanagement Hamburg GmbH is a municipal company which, among other things, provides construction, operation and management services for more than 50 general education schools in the south of Hamburg (Wilhelmsburg and Harburg) as well as for buildings of the university and municipal buildings.

The existing performance centre for rowing and canoeing in Allermöhe in the Bergdorf district is to be expanded. For this purpose, a new entrance zone, as well as a 2-storey boat hall with changing rooms, sanitary facilities, as well as strength, seminar and office rooms will be built. Furthermore, covered boat racks, an outdoor storage area and a motorboat garage will be built.

Here: Carpentry and timber construction

- Preparatory measures: construction site set-up, surveying work, production of workshop planning, static calculation, documentation, construction schedule

- Racks: 10m³ (455m) BSH GL28h for beam layer 10x22cm / 305m² OSB4, d=22cm / 305m² roof waterproofing membrane, plastic membrane with reinforcement made of polyester fabric and glass fleece insert

- Motorboat garage: 120m² exterior wall cladding, larch, d=22mm on 2-layer crossed substructure, incl. pre-greying paint / 40m² flooring, larch on single-layer flooring.

- Outdoor storage: 45m² exterior wall cladding, larch, d=22mm on single-layer substructure, incl. pre-greying paint / 1.6m³ (62m) KVH C24 S10 for columns and struts, 16x16cm / 6m³ (155m) Glulam GL28h for beam (14x28cm) and rafter layers 12x32cm / 80m² OSB4, d=30cm / 80m² roof waterproofing membrane, plastic membrane with reinforcement made of polyester fabric and glass fleece insert

- New boat shed and multi-purpose building:

- Collar beam roof boat shed: 33.7m³ (1375m) KVH C24 S10 for collar beams (10x20cm), rafters (10x28cm) and purlins (10x20cm) / 37 roof windows, wood (690x1400cm) / 7 single, 15 combi flashings / 37 roof windows (690x1400mm) with flashing frame and external blinds with electric drive / 3 scissor stairs / 125m² pointed floor covering made of rough-heaved sheet pile formwork, d= 22mm / 640m² vapour barrier, inter-rafter insulation, MiWo (WLG 0,038W/(mK), d=28cm / 640m² rafter insulation, d=4cm, wood fibre (WLG 0, 046W/(mK)

- Purlin roof staircase: 1.1m³ (37m) KVH C24 S10 for purlins (16x24cm) and rafters (8x18cm) / 25m² vapour barrier and inter-rafter insulation, MiWo (WLG 0.038W/(mK) / 30m² above-rafter insulation, d=4cm, wood fibre (WLG 0.046W/(mK)

- Tent roof weight room: 7.1m³ (75m) BSH GL28h for solid wall beams d=16cm and beam position 24x28cm / 8m³ (235m) KVH C24 S10 for rafters (12x28cm) / 175m² vapour barrier, inter-rafter insulation, MiWo (WLG 0.038W/(mK) / 175m² above-rafter insulation, d=4cm, wood fibre (WLG 0.046W/(mK) / 175m² battens 40/60mm / 175m² roof formwork, d=22mm / 175m² roof waterproofing membrane, plastic membrane with reinforcement made of polyester fabric and glass fleece insert, root-resistant, 50m eaves made of HPL panels

- Other work: blower door test, removal of roof windows in existing buildings, replacement of rafters in existing buildings, installation of new roof windows (134x140cm) with flashing frames