Laboratory, optical and precision equipments (excl. glasses) | Tenderlake

Laboratory, optical and precision equipments (excl. glasses)

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
25 May 2021
Closing Date:
22 June 2021
Location(s):
DE403 Frankfurt (Oder), Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
Wet etching tool platinum etching

General information:

— In order to estimate the consequential costs after the end of the warranty, a plan for the procurement of spare parts for the following 3 years must be issued,

— The plant is set up in a cleanroom class ISO 3-5.

The installation shall meet the following requirements:

— Maximum size (w x L x h): 1.00 m x 1.65 m x 2.50 m,

— machining of 8" Si substrates in batch (1x25),

— the installation must be state-of-the-art,

- Compatible with Entegris A192 — 81M (low profile PFA-Carrier) carrier,

— a process tank compatible with aqua regia (composition: 7 parts by volume 37% HCl and 1 volume part 65% HNO3) and can be heated to at least 90 degrees,

— possibility to dilute the aqua regia with DIW up to a ratio of 1:1 (composition: 7 volume parts 37% HCl and 1 volume part 65% HNO3 and 8 parts DIW),

— Optional: Carrier can be moved in the process basin (agitation),

— A DIW sink,

— the ability to spike HCl and/or HNO3 at specific times before and during the process,

— Manual loading and unloading, automatic transfer of the carrier between the process and sink,

— filling the process tank with is carried out from the central supply,

— Disposal of process chemicals from the process basin is carried out in a central waste disposal,

— Circulation filtration for process pools: pump and 0.1? m filter (type: Pall ABF1UFT3EH1K3),

— Maintenance work is only possible from the front of the front and back of the system, and cannot be accessed from the system side,

- All controls must be located on the front of the system,

— Ergonomic user interface (freely positionable screen),

— Front panel signal lights (min. red, yellow, green),

— Electrical connections: 230/400VAC 50Hz TN-S network (N/PE disconnected),

— the current version of the EC Machinery Directive must be complied with,

— 2014/30/EU EMC is fulfilled,

— Shelf must be CE certified.

Software:

— Available in German language,

— Multiple password-protected user levels,

— Multiple recipes can be saved

— Individual recipes can be created with the greatest possible flexibility of process parameters,

— Logging user activity, processes, and error messages.

Additional Requirements:

— 12 months warranty,

— plant training for operators/maintenance/process engineers,

— manuals in German, available digitally and printed on clean room paper,

— spare parts kit (please specify)

— Delivery to Incoterm 2010 DDP, DPU or DAP

— For deliveries outside the EU, the supplier is also the importer

— Media connections are to be defined in a technical clarification discussion.

General information:

— In order to estimate the consequential costs after the end of the warranty, a plan for the procurement of spare parts for the following 3 years must be issued,

— The plant is set up in a cleanroom class ISO 3-5.

The installation shall meet the following requirements:

— Maximum size (W x L x H): 1.00 m x 1.65 m x 2.50 m,

— machining of 8" Si substrates in batch (1x25),

— the installation must be state-of-the-art,

- Compatible with Entegris A192 — 81M (low profile PFA-Carrier) carrier,

— a process tank compatible with aqua regia (composition: 7 parts by volume 37% HCl and 1 volume part 65% HNO3) and can be heated to at least 90 degrees,

— possibility to dilute the aqua regia with DIW up to a ratio of 1:1 (composition: 7 volume parts 37% HCl and 1 volume part 65% HNO3 and 8 parts DIW),

— Optional: Carrier can be moved in the process basin (agitation),

— A DIW sink,

— the ability to spike HCl and/or HNO3 at specific times before and during the process,

— Manual loading and unloading, automatic transfer of the carrier between the process and sink,

— filling the process tank with is carried out from the central supply,

— Disposal of process chemicals from the process basin is carried out in a central waste disposal,

— Circulation filtration for process pools: pump and 0.1? m filter (type: Pall ABF1UFT3EH1K3),

— Maintenance work is only possible from the front of the front and back of the system, and cannot be accessed from the system side,

- All controls must be located on the front of the system,

— Ergonomic user interface (freely positionable screen),

— Front panel signal lights (min. red, yellow, green),

— Electrical connections: 230/400VAC 50Hz TN-S network (N/PE disconnected),

— the current version of the EC Machinery Directive must be complied with,

— 2014/30/EU EMC is fulfilled,

— filing must be CE certified

Software:

— Available in German language,

— Multiple password-protected user levels,

— Multiple recipes can be saved

— Individual recipes can be created with the greatest possible flexibility of process parameters,

— Logging user activity, processes and error messages

Additional Requirements:

— 12 months warranty,

— plant training for operators/maintenance/process engineers,

— manuals in German, available digitally and printed on clean room paper,

— spare parts kit (please specify)

— Delivery to Incoterm 2010 DDP, DPU or DAP

— For deliveries outside the EU, the supplier is also the importer

— Media connections are to be defined in a technical clarification discussion.

Download full details as .pdf
The Buyer:
IHP GmbH – Leibniz-Institut für innovative Mikroelektronik
CPV Code(s):
38000000 - Laboratory, optical and precision equipments (excl. glasses)