Build 3 IJveren (and as an option the construction of 7 extra IJveren) in the period 2023-2030
Supplying and installing 2 loading arms (and as an option supplying and installing up to 12 additional loading arms)
Maintenance related to the warranty obligations.
Maintenance of the electric and hybrid drive system (possibly also in the period after the warranty period).
Maintenance of the loading arms
Supply of strategic spare parts.
3 Ferries and 2 loading arms