KBI GmbH plans to convert the listed building of the former Puschkin high school on Rathenaustrasse in Hennigsdorf into a creative work - an interdisciplinary start-up and commercial center.
ESH GmbH is planning the construction of a functional swimming pool as a project promoter for the city of Hennigsdorf. The new functional swimming pool should be consistently geared to the minimum requirements for public use, use by school and club swimming, and health-promoting offers.
Both projects are implemented in parallel or overlapping on a mined property.
In order to ensure coordination in the construction process in terms of technical, time and content, both lots are awarded to a specialist company.
In general, the construction work in both projects is awarded in batches according to the construction trades involved.
Lot 500.04 - Outdoor facilities
Lot 1: KreativWerk - Interdisciplinary Founder and Business Center Hennigsdorf
— demolition measures (fence system, security of historical building materials, flagpole),
— approx. 950 square meters of asphalt bypass (parking area),
— approx. 790 sqm concrete block paving areas (pitches),
— approx. 1 080 sqm concrete block paving areas (access road/bicycle parking space),
— approx. 50 square meters of coloured plastic covering,
— approx. 46 m gabion wall, 10 m fence bions,
— approx. 105 m bar mesh fence with barrier systems
— mast lights, letterbox system,
— retractable and fixed bollards,
— approx. 455 square meters of mosaic stone and small stone paving areas (monument),
— approx. 85 m of historical buildings,
— approx. 1 075 sqm of trough surfaces,
— approx. 1 380 sqm shrub planting,
— approx. 1 200 square meters of lawn seeding,
— 27 tree plantings,
— 4 street tree planting, Marwitzerstraße,
— 1 pc garbage lifting system,
— approx. 25 m renovation of building historical clinker sockets,
— 2 pieces of walkway crossings,
— approx. 65 m of hollow silica rigols,
— 2 h walkway crossings,
— 1 pc underfloor lift system.
Lot 2: Construction of a functional swimming pool
— demolition measures (clinker base, securing historical building materials, gate system),
— approx. 340 sqm of concrete block paving surfaces (delivery zone, maintenance way),
— approx. 380 square meters of large-format concrete block slabs (urban forecourt),
— approx. 65 m bar mesh fence with gate systems,
— illuminates seat sculpture and staircase with railings,
— restoration of architectural historical clinker sockets,
— sanitation clinker sockets,
— filler rigols,
— 95 m drainage channel,
— approx. 150 sqm of dump areas,
— approx. 205 sqm shrub planting,
— approx. 1 060 square meters of lawn seeding,
— 1 pcs tree planting.