The Christiph-von-Schmid Realschule Thannhausen is to be completely renovated in the coming years.
For this purpose, the “roundel building” and part of the main building are first demolished. The extension of the secondary school will then be built here, a new break hall will be created and the school's accessibility will be established.
The execution of the overall project is planned in 2 construction phases.
1 piece aluminium mullion and transom façade approx. 17 x 4 m incl. 1 piece 2-fl. and 1 piece of 1-fl. Aluminum doors, incl. release element panel
1 piece aluminium mullion and transom façade approx. 17 x 4.6 m incl. 2 pieces 2-fl. Aluminum doors
1 piece aluminium mullion and transom façade approx. 7 x 3.2 m incl. 1 piece 2-fl. and 1 piece of 1-fl. Aluminum doors
3 pieces of aluminium outer door 1-fl. with fixed glazing on the side, approx. 3.15 x 2.4 m
1 piece aluminum outer door 2-fl. with fixed glazing on both sides, approx. 3.15 x 2.6 m
2 SHEV louvre windows, approx. 3.15 x 0.8 m