Demolition of an existing swimming pool and gym hall with changing rooms. The building also includes a boiler and transformer.
The building has 2 floors and consists of concrete in the basement and wood/brick and steel on the 1st floor.
A simple insulated building of approx. 10 m² shall also be delivered with provisional installations for HVAC and electro as the current boiler room and transformer also serve the school in the area and will be demolished together with the building.