New construction of a laboratory building, Leibniz respiratorium, drywall and interior plastering, 32000067OV
Trockenbauarbeiten:
- approx. 3 500 m 2 GK walls with different qualities and wall thicknesses,
- approx. 650 m 2 GK ceilings smooth,
- approx. 230 m 2 GK-acoustic ceilings,
- approx. 70 m 2 Metal ceilings.
Plaster works:
- approx. 1,475 m 2 Gypsum plaster,
- approx. 285 m 2 Lime cement plaster.
See II.1.4).