Supply of a modular building complex as part of the extension project of the K building of the CEA Grenoble
The purpose of this procedure is the supply of a set of modular buildings with a floor area of approximately 280 square m, as well as the execution of the works associated with the installation and connection of this complex with the K building located on the CEA Grenoble site.
These buildings will be installed on two levels (ground floor and first floor) and connected via a connecting walkway located on the 1st floor of Building K.
The modular buildings to be supplied and installed will be new and comply with the RE2020 (Environmental Regulations 2020).