Gerüstbauarbeiten
Construction of a timber building as a two-storey solid timber building for the replacement of the existing primary and secondary school with the following services:
• Working scaffolding as façade scaffolding, LK 3, W09, scaffolding height up to approx. 9.00 m:
• Building A, approx. 1750 m²
• Building B, approx. 820 m²
• Building C, approx. 2300 m²
(with provision, expansion to protective scaffold FL1 – safety frame and
Belagverbreiterung, b= 0,30 m)
• Stair tower 2-barrel, approx. 5 pieces
• Lattice girder bridging, l = up to 9.00 m, approx. 9 pieces
• Scaffolding up to approx. 8.70 m height and LxW up to approx. 6.60x10.60 m, a total of 6 pieces