As part of the implementation of the Heat Strategy 2020, Stadtwerke Greifswald is planning the construction of a combined heat and power plant and the construction of an innovative combined heat and power plant (CHP). As part of the overall project, two CHP modules, one electric boiler of approximately 5 MW el. In a new building to be built, a heat storage with 200 MWh capacity and a solar thermal system with approximately 17 000 m
20 kV MS network industrial park Helmshäger Berg
Cable route from UW Süd to the new Zenit substation to be constructed incl. Civil engineering, site preparation for SSt Zenit. The order includes delivery (including cable), installation and commissioning.