outdoor facilities
565 cbm demolition gravel
1000 cbm Bodenbewegung Geländemodelierung
420 m² earth planum, paths, paving work
2200 m² Erplanum lawn, sowing, etc.
Distribute 650 cbm topsoil lying
65 m drainage ditches, excavation, pipes, etc.
18 m Bodenrinnen
350 m of electrical cables, excavation, conduits, etc.
133 m cobblestone one-liner
420 m² paving with underbuild paths
9,2 m Winkelstützwand
2200 m² planting and preparation
8 pcs. trees
140 pcs shrubs
340 pcs ground cover