Renovation of the outdoor swimming pool in Esslingen-Berkheim:
The NRF is about 1 870 m
The following measures are to be implemented in the course of the upcoming refurbishment:
- total renovation of the inner and outer pools (stainless steel lining),
- Renovation of the foyer, changing room and sanitary area,
- Complete renewal of technical building installations (heating, ventilation, sanitary, electric and bathing water technology),
- barrier-free access,
- energetic upgrading of the building envelope.
The work is expected to start in September 2019 - May 2021.
- Free vegetation - about 365 m
- Demolition of outdoor facilities - flat rate,
- dismantling internals - flat rate,
- Disassembly of ceiling and wall coverings - approx. 1 600 m
- demolition of indoor swimming pool - flat rate,
- Demolition of floor structures and wall coverings - approx. 1 500 m
- Dismantling of asbestos cement sheets - approx. 500 m
- Dismantling facade, windows, tubular frame elements - about 165 m
- Dismantling roof construction - approx. 1 500 m
- Demolition shell construction - flat rate.