badenovaWÄRMEPLUS GmbH & Co. KG intends to expand the district heating network in several districts of Freiburg as part of the "Freiburg-West Heat Network" funding project. The total length of the planned network expansions is around 20 km and is to be carried out over the next few years. The present tender includes a section with a route length of approx. 1.8 km of the "Freiburg-Landwasser/Mooswald" district heating main line between the Landwasser combined heat and power plant at Wirthstraße 3 and the existing heating network in the northern industrial area, which ends in Achim-Stocker-Str. at the Europapark stadium. The entire district heating main pipeline has a route length of approx. 2.6 km, the remaining sections in Landwasser are already being executed as part of separate contracts or will be realized in the first half of 2024. Earthworks and pipeline construction works:
Demolition and restoration of surfaces in the area of the pipeline trenches: approx. 3,500 m2
Civil engineering and pipeline construction work on district heating:
The laying of pipelines is carried out in an open trench.
Pipeline length: approx. 1,860 m
Pipeline type: Plastic casing pipe mainly as a single pipe system (approx. 1,200 route metres) and in sections as a double pipe (approx. 660 route metres)
Nominal diameter: DN 200
Medium pipe: Steel pipe
Thermal insulation: Composite insulation made of rigid PUR foam
Sheath pipe: Plastic (PE-HD)
Transport medium: water
Nenndruckstufe: PN 16
Operating temperature flow: 95 °C
Operating temperature return: 55 °C
Network monitoring system: Nordic
Additional cable conduits and cable pull shafts will be laid
Earthworks, pipelines and road works
Traffic safety
Road construction: Demolition and restoration of road and pavement surfaces in the area of the
Leitungsgraben (ca. 3.500 m²)
Pipeline trenches, earthworks, excavation pits for connection to existing buildings (approx. 4,800 m³)