Lot 2 - Catenary system with earthworks
- 1930 m Dismantling single-catenary (double-track) including transverse structures
- Dismantle 760 m of chain catenary (double-track) including transverse structures
- 13 pcs dismantle wall fixtures
- Dismantle and dispose of 50 concrete poles
- Dismantle and dispose of 2 steel masts
- Remove 9 steel poles for reuse (partly concreted, partly sanded)
- Demolition and disposal of 155 m3 concrete foundation, including earthworks
- 71 pcs pipe foundation (drilling method), including earthworks
- 5 pcs Drilling through existing block foundation
- 27 pieces of painting of existing masts
- 71 pcs steel octagonal masts, supply and install; therefrom:
1 pc with wheel retensioning (weights inside)
29 pcs combined with public lighting
3 pcs combined with stop lighting
2 pcs combined with public lighting and wheel tensioning (weights inside)
3 pcs combined with traffic lights
3 pcs combined with public lighting and traffic lights
2 pcs with feed-in
1 pc with track separation
- 1 piece Mobile foundation with mast (up to 10 m / 140 kNm) as construction time. Makeshift
- 6 pcs new transverse structures for EF (transverse span)
- 42 new transverse structures for KF (transverse spans) with one or more straightening ropes
- 2 pcs boom for chainwork, two tracks, deliver and assemble
- Deliver and assemble 3 LSA booms
- Supply and assemble 28 pieces of arch trigger (contact wire or suspension cable, single or tip)
- 3 pcs wheel retensioning, 2x10 kN, weight guide in the mast, deliver and install
- 2 pcs wheel retensioning, 1x10 kN, weight guide in the mast, deliver and install
- 665 m New construction of single-catenary (double-track) incl. parent connector, regulage
- 2025 m New construction of a chain plant (double-track) including current-proof trailer, parent connector, regulage
- 1 new construction fixed point for chainwork, two tracks
- 3 new construction feed point for chainwork, two tracks, including earthworks
- 2 new track separation for chainwork, two tracks