4800 Gebäudeautomation / MSR Mittelschule Germaringen Building automation system KoGr. 480 see II.2.4).
4800 Gebäudeautomation / MSR Mittelschule Germaringen Total renovation of the building automation system KoGr. 480 Digital measurement, control and regulation system for HVAC systems with 2 information centers and a higher-level BMS system with BMS, visualization and trend facilities.
- BLCnet GLT - applications with management software, monitors, printers and UPS. Number of data points about 900,
- GSM / PRS communication module for remote access and fault message forwarding,
- Automation station ISP 10 with approx. 265 data points including switchgear,
- PSP 20 automation station with approx. 490 data points including switchgear
- Single room controller for HVAC application, BUS communication 46 pcs,
- Programming and Parameterization EZR 46 pcs.
Field devices:
Sensor HVAC approx. 45 pcs.
- Control valves u. engine. Butterfly valves DN 15-65 approx. 31 pcs,
- Zone valve for individual room control DN 15 49 pcs.
Cable and laying systems:
- Plastic sheathed cable NYM-J 3 x 1.5
- Communication cable JY (ST) Y 2 x 2 x 0.8
- Network cable Cat 7 Duplex approx. 600 m,
- Cable trays and track extensions, as well as clamping work.