This market concerns the realization of studies, the supply and the assembly in factory and on site of an injection station of the packages 870 liters on the INB 37A to realize within the framework of the lot 4A injection of the Pagode project relating to the renovation of BNI 37A.
The service, subject of this contract, is described in the specific technical specifications, supplemented by the general technical specifications, and the documents constituting the DCE as cited in article 2 of the draft contract. It must be carried out in accordance with the prescriptions, standards, laws and regulations in force.
The service includes in particular:
- the supply of deliverables described in the specific technical specifications (CCTP),
- the supply of deliverables described in the General Technical Specifications (CCTG),
- site surveys and the appropriation of existing equipment,
- the specific studies described in the special technical specifications necessary for the realization of the equipment,
- the drafting of all the documents necessary for the smooth running of the project and listed in the CCTP as well as in the CCTG,
- supplies,
- manufacturing of equipment and carrying out associated controls,
- mounting,
- factory tests,
- storage at the holder of the equipment before delivery to site,
- the deliveries,
- on-site operations such as:
—— participation in site organization and co-activity meetings,
—— the development of intervention areas,
—— preparatory work,
—— work in the building,
—— the recipes and tests of its supply on site,
—— basic compliance and controls,
—— training in the use of the machine and its maintenance,
- the supply of a 1
- the supply of specific tools necessary for the maintenance of the equipment,
- carrying out all the missions described in the general technical specifications (control of deadlines, control of invoicing, control of configuration, quality management, monitoring of safety requirements, compliance with and monitoring of environmental requirements, carrying out inspections, respecting technical requirements, respecting site organization and intervention methods in BNI 37A, etc.),
- packaging and disposal of waste in accordance with the waste management procedure.
And, more generally:
- the supply of all the equipment necessary for carrying out the work specified in the specifications,
- the contractual documentation, and in particular the supply of the elements for the constitution of the File of the executed works (DOE) which conditions the acceptance of the market,
- the associated certificates of conformity and the reports of the inspections carried out,
- all the subjugations linked to a service taking place on 1 CEA site (formalities of access to the center, prevention plans, DOT, DIMR, medical follow-up of the intervening staff and the previous training sessions),
- protection of existing structures and securing of the site,
- participation in meetings with the CEA and / or the MOE described in the general technical specifications and the draft contract in paragraph 4.7,
- keeping the premises and premises where the work is carried out clean.