Scaffolding with a protective roof for the renovation of precoolers at the Zollverein coking plant
The pre-coolers are to be completely equipped from the outside for repair (corrosion protection, steel construction renovation) and the pump house for masonry renovation. It must be ensured that all components/sides of the pre-cooler, including the pipes and staircases as well as the pump house, can be processed by hand on the masonry surfaces and concrete overhangs.
Room scaffolding load class 4, 2.0kN/m2 approx. 45,000m3
Scaffolding approx. 7,200 m2
Podium stair towers load class 3, 2kN/m2 4pcs.
Transport platforms delivery height 50m, 2pcs.
Trapezoidal sheet roofing approx. 1,100 m2
Work scaffolding approx. 800m2
Total holding approx. 10 months