S 177 OU Wünschendorf/Eschdorf, Lot 5.5 Building 6 and RRB 3
Preparatory work
- Construction road 2,900 m²
- Exploratory boreholes explosive ordnance 360 pcs
- Area sounding of explosive ordnance 7,750 m²
BW 6
- Build excavation 680 m³
- Manufacture working level incl. access ramps 563 m³
- Establish a stream diversion 200 m
- Make a fan dam 26 m
- In-situ concrete displacement pile produce vertically 380 m
- Making in-situ concrete displacement pile inclined 220 m
- Prepare pile head 38 pcs
- Make pile foot 38 pcs
- Produce reinforced concrete C 30/37 156 m³
- Produce reinforced concrete C 35/45 375 m³
- Installing reinforcing steel 123 t
- Create embankment staircase 18 m
- Produce asphalt surface course from SMA 11 S 330 m²
- Install collision barrier 220 m²
- Fine-grained soil provide 360 m³
- Remove and cover topsoil 220 m³
- Make insert 310 m²
- Making wet sowing 690 m²
- Erosion protection mats lay 690 m²
RRB 3/ RKB 3
- Shoring, anchored 560 m²
- water retention
- Precast shaft structures (WU-Beton):
Separation structure, dimensions in floor plan 3.5 x 1.75 m, height 2.1 m;
Consolidation structure, dimensions in floor plan 3.5 x 1.75m, height 2.1 m
Throttle shaft, dimensions in plan 4.0 x 2.25 m, height 3.0 m
- Rain clarifier (underground, WU concrete):
Precast reinforced concrete elements, dimensions in floor plan 12.5 x 3.0 m, height 2.8 m
- Rain retention basin (underground, WU concrete):
Precast reinforced concrete elements, dimensions in floor plan 16.6 x 5.5 m, height 3.2 m