Test engineer performance for the construction pit securing of the overall project Riederwaldtunnel in the course of the new construction of the BAB 66 Frankfurt aM - Fulda
For the project referred to in point II.1.4) of this notice, the following main services must be provided:
- Checking the mathematical proof of stability and design drawings in a static constructive respect.