Lot 1.1_B180_Streckenlos 1 and BW 1A
Traffic safety, road and bridge construction
Set up 8 traffic control states
10,000 m³ of topsoil removal, storage and reinstallation
15,000 m³ topsoil removal
75,000 m² soil improvement with hydraulic binders
100,000 m³ dam building material
Produce 28,000 m² of asphalt superstructure
60.50 m reinforced concrete pipe DN 400
72 m reinforced concrete pipe DN 800
Delivering and installing 700 m³ of concrete, including formwork
Delivering and installing 90 t rebar
67 m steel railing
75 m² of mastic asphalt
Create 38 m embankment stairs
Produce 38 m rough bed trough