Rehabilitation radiology and radiotherapy, S3 component C+D/ Lot 31 Metal frame elements glazed
In the Braunschweig Municipal Hospital, large-scale medical equipment is to be replaced in various measures during ongoing operation.
The project is currently being built on the extension of a 2-storey building (component B) to accommodate an MRI and CT. The adjoining premises in the existing building (component C+D) will also be fundamentally rebuilt. The complete conversion of the existing building will take place in individual construction phases (3rd to 6.BA), during the ongoing operation of the adjacent rooms.
Scope of services (in the 3rd-6th construction phase; Component C+D):
7 pcs interior door systems, aluminum, smoke and fire protection systems
12 m² frame construction fixed glazed G30 incl. 1 door glazed T30