Demolition works Gotthard-Müller School.
Dismantling of the school building in reinforced concrete skeleton construction. Facade panels with polystyrene core. Constructed room about 18 030 m
- mineral construction waste Z1.1-Z2, approx. 4 750 t,
- mineral construction waste DK I: approx. 1 000 t,
- other waste approx. 350 t (wood, glass, floor coverings etc.),
- Hazardous substances: Asbestos cement products, asbestos-containing roofing membranes, insulation made of artificial mineral fibers. Immediately adjacent new building with school operation.