Heating technology:
- 99 pcs. tube radiators
- approx. 1,800 m pipeline network up to DN 50
- 2 heating circuits including control technology
Sanitary engineering:
- Connection of approx. 75 on-site extraction points on the drinking water and waste water side
- approx. 450 m sewer line up to DN100
- approx. 690 m of drinking water pipe up to DN 40
- 2 hygiene rinse groups
- Connection of approx. 75 gas extraction points
- approx. 230 m gas line
Heating technology:
- 99 pcs. tube radiators
- approx. 1,800 m pipeline network up to DN 50
- 2 heating circuits including control technology
Sanitary engineering:
- Connection of approx. 75 on-site extraction points on the drinking water and waste water side
- approx. 450 m sewer line up to DN100
- approx. 690 m of drinking water pipe up to DN 40
- 2 hygiene rinse groups
- Connection of approx. 75 gas extraction points
- approx. 230 m gas line