General construction work for pipelines

Contract Value:
EUR 66M - 66M
Notice Type:
Contract Notice
Published Date:
13 December 2023
Closing Date:
12 January 2024
Location(s):
DE131 Freiburg im Breisgau, Stadtkreis (DE Germany/DEUTSCHLAND)
Description:
Development of BG Dietenbach: southern development, construction work, civil engineering and pipeline construction for drinking water pipes, empty pipes, electricity and empty pipes for the later installation of district heating, media pipes.

In Freiburg Dietenbach, a new district for about 16 thousand people is being built. As part of the external development measures, pipeline work for drinking water must be carried out. The section of the route runs along Opfinger Str via Tel-Aviv-Yafo-Allee to Mundenhofer Str. In addition, the coordinated measures of the crossings by means of empty pipes for district heating and drinking water in the area of Opfinger Str (tram crossing) are to be carried out.

Most of the pipeline is laid in an open trench. For the crossing of the tram line in Opfinger Str, a closed construction method is planned for the drinking water pipeline and district heating pipeline in empty conduits.

- Invitation to tender for earthworks and pipeline construction works, - Demolition and restoration of surfaces in the area of the pipeline trenches: 744 m²

- Aushub: ca. 1640 m³ - Leitungsbau:

TW DN 500 GGG – 620 m; FW – conduits – DN 700 for subsequent installation of district heating pipes approx. 2x24m; Electricity conduits - 2xDN 125 and 1xMulti4 conduits c

Civil engineering and pipeline construction work on district heating:

• The conduits will be laid in a closed construction method to cross the tram line.

• Cable length: approx. 2x24m m

• Pipeline type: GRP conduit

• Nominal diameter: DN 700

Earthworks, pipelines and road works

o Traffic safety (in the title drinking water)

o Road construction: Demolition and restoration of road and pavement surfaces in the area of the pipeline ditches (in the title drinking water)

o Pipeline trenches, earthworks, excavation pits for connection to existing buildings (in the title drinking water)

Title drinking water:

- General work

the Nachweisleistungen

- Earthworks, pipelines and road construction works

o Traffic safety

o Road construction: Demolition and restoration of road and pavement surfaces in the area of the pipeline trenches (approx. 744m²)

o Pipeline trenches, earthworks, excavation pits for connection to existing buildings (approx. 1640 m³)

- Pressure pipeline work drinking water PN16 (pipeline construction)

the Herstellung DN500 GGG Leitung ca. 620m

o Construction of DN500 (DN 700 conduit), tram line crossing, length approx. 25 m in closed construction

Title Empty Conduits Electricity:

- General work

the Nachweisleistungen

- Earthworks, pipelines and road construction works

o Traffic safety

o Road construction: Demolition and restoration of road and pavement surfaces in the area of the pipeline trenches (approx. 1400 m²)

o Pipeline trenches, earthworks, excavation pits (approx. 2100 m³)

Download full details as .pdf
The Buyer:
badenovaWÄRMEPLUS GmbH & Co. KG
CPV Code(s):
45112100 - Trench-digging work
45231100 - General construction work for pipelines