Outdoor facilities - Landscape gardening work
- Pflasterausbruch ca. 150 m²
- Oberbodenarbeiten ca. 40 m³
- Ground work, incl. trench / foundation excavation approx. 600 m³
- Pflanzsubstrat ca. 25 m³
- Entwässerungsleitungen DN100-DN150 ca. 150 m
- Drainage channels approx. 35 m
- Kabelleerrohre ca. 120 m
- Asphalt surface approx. 700 m²
- Pflasterbelag Betonpflaster ca. 450 m²
- of which underbuilt flooring areas approx. 280 m²
- Benches 6 pcs
- Waste container 5 pcs
- Lawn/meadow areas approx. 350 m²
- Planting areas ground cover approx. 150 m²
- Trees 5 pcs