Tile work.
The following work is planned as part of the construction project:
1st construction phase new building:
- approx. 116 m
- Cross joint, base tile, laying with wall tiles in the joint grid;
- approx. 116 m
- Installation of large-format wall mirrors made of laminated safety glass, on the same level with tile covering.