Electrical design
The engineering services are to be commissioned - electrical planning in accordance with § 53
HOAI (system groups 4-6 as well as PV system) in step-by-step form (power phases 1-9) for which the
Implementation of the project to build a new school and ball sports hall
in Ergolding. Upon conclusion of the contract, the
Performance level1, which covers work phases 1 and 2
Includes. Stage 2 includes work phase 3, stage
3 includes the work phases 5 - 7 and level 4 includes the
Performance phases 8 and 9. Participation in the
Funding and monitoring of
Rectification of defects should also be commissioned.
The eligible costs according to HOAI are around
3.000.000 € net.
The market Ergolding, represented by Mr. 1st Mayor
Strauss, intends, together with the Landshut district,
represented by District Administrator Peter Dreier, in the area of
existing 3-fold sports hall Ergolding the realization of a
3- + 1-fold sports hall incl. consideration of other
municipal and district-owned uses. With
of the planning is to be carried out immediately after the contract has been awarded.
(expected Q4 2023)
can be started.