Flood protection and renaturation Kleine Emme:
- length of channel with widening and bank block protection on the right bank approx. 700 m;
- Length of channel with pre-protection bank on the left bank approx. 700 m;
- Length of new footpaths and maintenance paths approx. 900 m;
- Length of the new reinforced concrete wall along the "natural space" approx. 130 m.
Extension of the Bodenhof relief sewer
- Length of sewer construction approx. 630 m.
Flood protection and renaturation Kleine Emme:
- length of channel with widening and bank block protection on the right bank approx. 700 m;
- Length of channel with pre-protection bank on the left bank approx. 700 m;
- Length of new footpaths and maintenance paths approx. 900 m;
- Length of the new reinforced concrete wall along the "natural space" approx. 130 m.
Extension of the Bodenhof relief sewer
- Length of sewer construction approx. 630 m.