Specialist planning of structural engineering according to 51 ff. HOAI 2013; Lph 2-6 (+ 8) for the 12th elementary school Dresden-Cotta, Hebbelstr. 20, 01156 Dresden.
Specialist planning of structural engineering according to HOAI § 51 ff. I. V. m. Appendix 14, LPH 1-6 (+8) for the scope of services of the following sub-objects in the project "12. Elementary School Dresden-Cotta ":
- Complete renovation of the listed school building with extension for elevator (TO 1);
- Refurbishment of the listed sports hall with connection (roofing) to the school building and with an extension (TO 2);
- Construction of a 1-field sports hall (TO 3);
- Redesign and preparation of the open spaces (TO 4).
The state capital Dresden intends to completely renovate the school building, to renovate and expand the existing sports hall and to build a new 1-field sports hall. It is planned to apply for funding for the construction project, but probably no EU funding.
- Total cost framework (KG 200-700): currently approx. EUR 12.872 million gross (base costs 2019 plus 4% BPI);
- Building costs (KG 300 + 400): approx.7.74 million EUR gross (base costs 2019 plus 4% BPI).
The client (AG) intends the service phases (Lph) 2 to 6 (+ 8) of the service specialist planning structural engineering according to. 51 ff. HOAI 2013. The order is placed in stages. At the end of the negotiation process, service phase 2 is contractually commissioned. There is no legal claim to the transfer of all service phases. Likewise, there is no legal claim to further assignment after the first service phases have been rendered. The completion of service phase 8 is expected in 2025.