Fundamental renewal of Petersdorfer Straße 1st BA including new construction of a footpath and cycle path as well as new construction of a drinking water pipe
Road constructionLot 1 - 320 m² pick up and dispose of concrete paving stones or slabs,
- pick up 4,690 m² of natural stone paving and drive to Lagerplatz AG,
- 420 m² of asphalt pavement and recycle,
- 890 m² of concrete pavement and recycle,
- loosen and store 9,990 m³ of soil including topsoil,
- supply and install 3,140 m³ of soil,
- 285 m Betonrohrleitung DN 300 repair,
- manufacture 8 shafts DN 1000,
- produce 35 m pipe from PP DN 150,
- produce 3,390 m³ frost protection layer,
- produce 6,435 m² gravel base course,
- produce 8,335 m² of asphalt,
- produce 380 m² HGT,
- produce 380 m² concrete ceiling C 30/37,
- produce 420 m² of concrete slabs/pavements,
- produce 165 m KerbDrain kerbstones from polymer concrete,
- produce 195 m concrete board,
- dispose of 24,275 t of soil Z0- >Z2,
- dispose of 1,100 t topsoil,
- dispose of 2,000 tons of mixed construction and demolition waste,
- 6 light points including cable laying,
- demolish, dispose of and restore 30 m reinforced concrete pipeline DN 1000,
- marking work
Line constructionLot 2 - approx. 890 m Producing drinking water pipe DN 150 PE100
- of which 765m DN 150 in controlled tunnelling
- Integration of drinking water nodes DN 400
- Production of drinking water nodes DN 150
- approx. 940 m drinking water pipe DN 150 AZ demolish