Electricity | Tenderlake

Electricity

Contract Value:
PLN 1M - 1M
Notice Type:
Contract Notice
Published Date:
13 December 2022
Closing Date:
13 January 2023
Location(s):
PL416 Kaliski (PL Poland/POLSKA)
PL431 Gorzowski (PL Poland/POLSKA)
PL432 Zielonogórski (PL Poland/POLSKA)
PL515 Jeleniogórski (PL Poland/POLSKA)
PL516 Legnicko-Głogowski (PL Poland/POLSKA)
PL517 Wałbrzyski (PL Poland/POLSKA)
PL518 Wrocławski (PL Poland/POLSKA)
Description:
Electricity supply.

The subject of the order is the supply (sale) of electricity to the Headquarters and the outlets of the Nadodrzański Branch of the Border Guard. The subject of the order is divided into 13 (thirteen) parts of the order, a detailed description of each part of the subject of the order is included in Annex 2 to SWZ.

Border Guard Branch Headquarters

Krosno Odrzańskie Branch – planned amount of 560 000 kWh. Electricity around the clock. The contracting authority is classified to the C21 tariff group, the power factor tg ≤ 0.4, the sale of electricity will take place with a connection with 0.4 kV rails built on the basis of the conditions of connection to the network with a contractual capacity of 200 kW. The energy consumption point is located in the DSO area: ENEA Operator Sp. z o.o.

Border Guard Facility in Wrocław - Strachowice

PSG in Wrocław – planned amount of 52 000 kWh. Electricity around the clock. The Ordering Party is qualified to the V connection group and settled in tariff group C11, 3-phase supply voltage 0.4 kV, contractual power 11 kW, conversion protection 32A. The energy consumption point is located in the DSO area: Tauron dystrybucja S.A.

Border Guard facility in Legnica

PSG in Legnica — the planned amount of 59 000 kWh. Round-the-clock electricity. The contracting authority is qualified for the V connection group and settled in tariff group C11, supply voltage 3- phase 0,4 kV, contractual power 40 kW, converter protection 63A. Power consumption points are located within the DSO: Tauron Distribution S.A.

Border Guard facility in Kłodzko

PSG in Kłodzko – planned amount of 152 000 kWh. Electricity around the clock. The ordering party is qualified to the IV connection group and settled in tariff group C21, 3-phase supply voltage 0.4 kV, contractual power 65 kW, conversion protection 125A. Energy consumption points are located in the DSO area: Tauron dystrybucja S.A.

Border Guard facility in Gorzów Wlkp.

PSG in Gorzów Wlkp – planned amount of 56 000 kWh. Electricity around the clock. The Ordering Party is qualified to the IV connection group and settled in tariff group C21, power factor tg ≤ 0.4, contractual power 50 kW. The energy consumption point is located in the DSO area: ENEA Operator Sp. z o.o.

Border Guard facility in Tuplice

PSG in Tuplice – planned amount of 65 000 kWh. Electricity around the clock. The contracting authority is qualified to the C11 tariff group, energy supply in a 3-phase system, with pre-meter protection 32 A, with a contractual power of 14 kW. The measuring and billing system consists of a settlement meter with fabr. 7575688. The energy consumption point is located on the premises of the DSO: ENEA Operator Sp. z o.o.

Border Guard facility in Kalisz

PSG in Kalisz – planned amount of 47 000 kWh. Electricity around the clock. The contracting authority is classified to tariff group C11, power factor tgφ ≤ 0.4, contractual power 13 kW with pre-meter protection 25 A in a 3-phase system. The energy consumption point is located on the premises of the DSO: ENERGA OPERATOR S.A.

Border Guard facility in Secular;

PSG in Świecko - multifunctional building - planned amount of 449 000 kWh. The contracting authority is qualified to tariff group B23, power factor tgφ ≤ 0.4, cable line with a voltage of 15.0 kV, with a contractual power of 150 kW. The energy consumption point is located in the DSO area: ENEA Operator Sp. z o.o.

Border Guard Factor in Zgorzelec - Building No. 1

PSG in Zgorzelec – planned amount of 79 000 kWh. Electricity around the clock. The Ordering Party is classified to tariff group C11, power factor tgφ ≤ 0.4, contractual power 40 kW, conversion protection 63A. The energy consumption point is located in the DSO area: Tauron dystrybucja S.A.

Border Guard Post in Zgorzelec - garages.

PSG in Zgorzelec, garage - planned amount of 6 500 kWh. Electricity around the clock. The Ordering Party is classified to the C11 tariff group, contractual power 16.1 kW, conversion protection 25A. The energy consumption point is located in the DSO area: Tauron dystrybucja S.A.

Border Guard facility in Zielona Góra - Babimost

PSG in Zielona Góra – planned amount of 43,000 kWh. Electricity around the clock. The Ordering Party is classified to tariff group C11, contractual power 11 kW, conversion protection 25A. The contractor will supply electricity from 3-phase connections. The energy consumption point is located in the DSO area: ENEA Operator Sp. z o.o.

Border Guard facility in Jelenia Góra

PSG in Jelenia Góra – planned amount of 59 000 kWh. Electricity around the clock. The Ordering Party is qualified to the IV connection group and settled in tariff group C21, 3-phase supply voltage 0.4 kV, contractual power is 50 kW. The energy consumption point is located in the DSO area: Tauron dystrybucja S.A.

Contact Point with its registered office in Kudów Zdrój

PSG in Kudowa Zdrój – planned amount of 48,000 kWh. Electricity around the clock. The Ordering Party is qualified to the IV connection group and settled in tariff group C11, 3-phase supply voltage 0.4 kV, contractual power is 40 kW. The energy consumption point is located in the DSO area: Tauron dystrybucja S.A.

Download full details as .pdf
The Buyer:
Nadodrzański Oddział Straży Granicznej
CPV Code(s):
09310000 - Electricity