Building materials | Tenderlake

Building materials

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
27 October 2023
Closing Date:
30 November 2023
Location(s):
PL63 Pomorskie (PL Poland/POLSKA)
Description:
"Successive delivery of building materials in 2024".

The subject of the Contract is divided into six parts: Lot No. 1 - supply of building materials: concrete blocks; Lot No. 2 - supply of building materials: curb, edging, openwork slab, resistor; Lot No. 3 - supply of building materials: cement and sand ballast, ready-mixed concrete;

Lot No. 4 - Supply of building materials: stone aggregate, aggregate; Lot No. 5 - Supply of Building Materials: Sand, Lot No. 6 - Supply of Building Materials: YOMB Board. A Contractor may submit a bid for six (6) Lots. The maximum number of Lots for which a contract may be awarded to the same Contractor: six (6). The subject of the contract is the cyclical supply of construction materials to the Contracting Authority, consisting in their delivery and unloading in the places indicated in the orders awarded by the Ordering Party. The Ordering Party reserves the right to collect it with its own transport – it applies to lots no. 1, 3, 4, 5. In this case, the loading is the responsibility of the Supplier.

delivery of building materials: concrete cube.

A. The Contractor shall supply and unload the object of the contract at his own expense to the places indicated by the Contracting Authority, among the following:

- headquarters of Ordering - 78 Gdańska Street in Władysławów,

- construction sites carried out by the Contracting Authority and located

in the Municipality of Władysławowo,

- sites of building houses implemented within the borders of the Pomeranian Voivodeship.

The Ordering Party reserves the right to collect the building materials – concrete cubes (lot no. 1) by their own transport. In this case, the loading is the responsibility of the Supplier.

B. The Contracting Authority shall each time anticipate the demand for a given construction site by sending an order by e-mail to the Supplier in order to prepare for delivery of a given amount of construction materials.

The quantity of materials indicated in the order must be prepared for delivery within 7 days from the date of sending the order by e-mail. Deliveries of materials to the places indicated in the order will be carried out within 2 days from the notification by phone or e-mail by persons authorized by the Ordering Party. As a rule, deliveries of a given order will be carried out in full transports. The Ordering Party stipulates that the last batch of delivery of a given order may be carried out as a delivery with incomplete transport. Therefore, the supplier will not demand any additional remuneration from the Ordering Party related to the delivery of the cube

with incomplete transport.

C. The offer price for the supply of building materials should include; any costs, including transport and landing at the place of delivery, and shall not change throughout the delivery period.

D. Any delivery must be confirmed by the person appointed by the Contracting Authority on the WZ document issued by the Supplier.

The original WZ document will form the basis for the qualitative and quantitative reception of the ordered batch of material.

E. The quantities of building materials listed above represent the estimate, the actual quantities of the building material ordered may be smaller.

In this case, the Suppliers do not serve for this claim.

F. Pallets will be returned to the Supplier at the request of the Ordering Party within a period of not less than 30 days and not longer than 120 days from the date of delivery of a given batch of pallets, and their price is not included in the cost of materials (the Supplier will not charge the Ordering Party with the costs of pallets). The cost of using pallets by the Ordering Party should be included in the price of the material. If the Ordering Party exceeds the 120-day deadline for returning pallets, the Supplier shall charge the Ordering Party with the costs of the pallets at the unit price specified in the Supplier's offer. The price for 1 pallet is one of the criteria for the evaluation of offers and the Supplier will declare the price for 1 pallet in point 2B of the Offer Form.

delivery of building materials: curb, edging, openwork plate, resistance.

A. The Contractor shall supply and unload the object of the contract at his own expense to the places indicated by the Contracting Authority, among the following:

- headquarters of Ordering - 78 Gdańska Street in Władysławów,

- construction sites carried out by the Contracting Authority and located

in the Municipality of Władysławowo,

- sites of building houses implemented within the borders of the Pomeranian Voivodeship.

The Ordering Party reserves the right to collect the building materials – concrete cubes (lot no. 1) by their own transport. In this case, the loading is the responsibility of the Supplier.

B. The Contracting Authority shall each time anticipate the demand for a given construction site by sending an order by e-mail to the Supplier in order to prepare for delivery of a given amount of construction materials.

The quantity of materials indicated in the order must be prepared for delivery within 7 days from the date of sending the order by e-mail. Deliveries of materials to the places indicated in the order will be carried out within 2 days from the notification by phone or e-mail by persons authorized by the Ordering Party. As a rule, deliveries of a given order will be carried out in full transports. The Ordering Party stipulates that the last batch of delivery of a given order may be carried out as a delivery with incomplete transport. Therefore, the supplier will not demand any additional remuneration from the Ordering Party related to the delivery of the cube

with incomplete transport.

C. The offer price for the supply of building materials should include; any costs, including transport and landing at the place of delivery, and shall not change throughout the delivery period.

D. Any delivery must be confirmed by the person appointed by the Contracting Authority on the WZ document issued by the Supplier.

The original WZ document will form the basis for the qualitative and quantitative reception of the ordered batch of material.

E. The quantities of building materials listed above represent the estimate, the actual quantities of the building material ordered may be smaller.

In this case, the Suppliers do not serve for this claim.

F. Pallets will be returned to the Supplier at the request of the Ordering Party within a period of not less than 30 days and not longer than 120 days from the date of delivery of a given batch of pallets, and their price is not included in the cost of materials (the Supplier will not charge the Ordering Party with the costs of pallets). The cost of using pallets by the Ordering Party should be included in the price of the material. If the Ordering Party exceeds the 120-day deadline for returning pallets, the Supplier shall charge the Ordering Party with the costs of the pallets at the unit price specified in the Supplier's offer. The price for 1 pallet is one of the criteria for the evaluation of offers and the Supplier will declare the price for 1 pallet in point 2B of the Offer Form.

supply of building materials: cement and sand ballast, ready-mixed concrete.

A. The Contractor shall supply and unload the object of the contract at his own expense to the places indicated by the Contracting Authority, among the following:

- headquarters of Ordering - 78 Gdańska Street in Władysławów,

- the sites of construction houses carried out by the Ordering Party and located in

The Municipality of Władysławowo,

- sites of building houses implemented within the borders of the Pomeranian Voivodeship.

The Contracting Authority reserves the possibility of receiving its own transport. Then the loading lies on the Supplier's side.

B. Delivery of materials to the places indicated in the order will be carried out within... hours of the notification by telephone or e-mail by persons authorized by the Contracting Authority. Delivery date from the application is one of the criteria for assessing tenders and the Contractor will declare the delivery period in point 2C of the Offer Form.

C. The offer price for the supply of building materials should include; all costs, including transport and landing at the place of delivery, and shall not change throughout the delivery period, shall apply to items with transport. In items without transport, the offer price for the supply of building materials should include; any costs, including landing at the place of delivery, and shall not change throughout the delivery period.

D. Any delivery must be confirmed by the person appointed by the Contracting Authority on the WZ document issued by the Supplier. The original WZ document will form the basis for the qualitative and quantitative reception of the ordered batch of material.

E. The quantities of building materials listed above represent the estimate, the actual quantities of the building material ordered may be smaller.

In this case, the Suppliers do not serve for this claim.

G. The Contracting Authority stipulates that the supply of a given order in terms of cement-sand and concrete fuels can be carried out as a supply with incomplete transport, i.e. the minimum supply in question may be 1.5 m3 of concrete or cement-sand backfilling. Therefore, the supplier will not demand additional remuneration from the Contracting Authority related to the supply of concrete or incomplete transport.

H. The warranty period will be 36 months from the date of delivery.

delivery of building materials: stone aggregate, aggregate.

A. The Contractor shall supply and unload the object of the contract at his own expense to the places indicated by the Contracting Authority, among the following:

- headquarters of Ordering - 78 Gdańska Street in Władysławów,

- the sites of construction houses carried out by the Ordering Party and located in

The Municipality of Władysławowo,

- sites of building houses implemented within the borders of the Pomeranian Voivodeship.

The Contracting Authority reserves the possibility of receiving its own transport. Then the loading lies on the Supplier's side.

B. Delivery of materials to the places indicated in the order will be carried out within... hours of the notification by telephone or e-mail by persons authorized by the Contracting Authority. Delivery date from the application is one of the criteria for assessing tenders and the Contractor will declare the delivery period in point 2C of the Offer Form.

C. The offer price for the supply of building materials should include; all costs, including transport and landing at the place of delivery, and shall not change throughout the delivery period, shall apply to items with transport. In items without transport, the offer price for the supply of building materials should include; any costs, including landing at the place of delivery, and shall not change throughout the delivery period.

D. Any delivery must be confirmed by the person appointed by the Contracting Authority on the WZ document issued by the Supplier. The original WZ document will form the basis for the qualitative and quantitative reception of the ordered batch of material.

E. The quantities of building materials listed above represent the estimate, the actual quantities of the building material ordered may be smaller.

In this case, the Suppliers do not serve for this claim.

G. The Contracting Authority stipulates that the supply of a given order in terms of cement-sand and concrete fuels can be carried out as a supply with incomplete transport, i.e. the minimum supply in question may be 1.5 m3 of concrete or cement-sand backfilling. Therefore, the supplier will not demand additional remuneration from the Contracting Authority related to the supply of concrete or incomplete transport.

H. The warranty period will be 36 months from the date of delivery.

supply of building materials: sand

A. The Contractor shall supply and unload the object of the contract at his own expense to the places indicated by the Contracting Authority, among the following:

- headquarters of Ordering - 78 Gdańska Street in Władysławów,

- the sites of construction houses carried out by the Ordering Party and located in

The Municipality of Władysławowo,

- sites of building houses implemented within the borders of the Pomeranian Voivodeship.

The Contracting Authority reserves the possibility of receiving its own transport. Then the loading lies on the Supplier's side.

B. Delivery of materials to the places indicated in the order will be carried out within... hours of the notification by telephone or e-mail by persons authorized by the Contracting Authority. Delivery date from the application is one of the criteria for assessing tenders and the Contractor will declare the delivery period in point 2C of the Offer Form.

C. The offer price for the supply of building materials should include; all costs, including transport and landing at the place of delivery, and shall not change throughout the delivery period, shall apply to items with transport. In items without transport, the offer price for the supply of building materials should include; any costs, including landing at the place of delivery, and shall not change throughout the delivery period.

D. Any delivery must be confirmed by the person appointed by the Contracting Authority on the WZ document issued by the Supplier. The original WZ document will form the basis for the qualitative and quantitative reception of the ordered batch of material.

E. The quantities of building materials listed above represent the estimate, the actual quantities of the building material ordered may be smaller.

In this case, the Suppliers do not serve for this claim.

G. The Contracting Authority stipulates that the supply of a given order in terms of cement-sand and concrete fuels can be carried out as a supply with incomplete transport, i.e. the minimum supply in question may be 1.5 m3 of concrete or cement-sand backfilling. Therefore, the supplier will not demand additional remuneration from the Contracting Authority related to the supply of concrete or incomplete transport.

H. The warranty period will be 36 months from the date of delivery.

delivery of building materials: YOMB board.

A. The Contractor shall supply and unload the object of the contract at his own expense to the places indicated by the Contracting Authority, among the following:

- headquarters of Ordering - 78 Gdańska Street in Władysławów,

- the sites of construction houses carried out by the Ordering Party and located in the Municipality of Władysławowo,

- sites of building houses implemented within the borders of the Pomeranian Voivodeship.

B. The Contracting Authority shall each time anticipate the need for a particular construction by sending an order to the Provider in order to prepare for delivery of a given amount of YOMB plates. The quantity of materials indicated in the order must be prepared for delivery within 7 days from the date of sending the order by email. Delivery of materials to the places indicated in the order will be made within 2 days of the notification by telephone or e-mail by persons authorized by the Contracting Authority. As a rule, the delivery of a given order will be carried out with full transports. The Contracting Authority stipulates that the last delivery batch of the order in question may be carried out as delivery with incomplete transport.

Accordingly, the supplier will not demand additional remuneration from the Ordering Party related to the supply of YOMB discs with incomplete transport.

C. The offer price for the supply of building materials should include; any costs, including transport and landing at the place of delivery, and shall not change throughout the delivery period.

D. Any delivery must be confirmed by the person appointed by the Contracting Authority on the WZ document issued by the Supplier.

The original WZ document will form the basis for the qualitative and quantitative reception of the ordered batch of material.

E. The quantities of building materials listed above represent the estimate, the actual quantities of the building material ordered may be smaller.

In this case, the Suppliers do not serve for this claim.

Download full details as .pdf
The Buyer:
ABRUKO sp. z o.o.
CPV Code(s):
44111000 - Building materials