ETICS and plastering work Technical Centers
The primary school Gustav-Brunner-Schule in Ginsheim-Gustavsburg is converted into an all-day school and expanded. A new, three-storey school building with no basement (Building E) with two technical superstructures on the main roof is built. The existing cobbler's building (Building C) from the 1960s will be renovated in terms of energy efficiency. Both buildings are connected by a vestibule on the ground floor and by a bridge on the upper floors.
The course includes the ETICS and plastering work as comb plastering of two technical floors on the new building (building E) with a total of two technical floors. approx. 320m².