The construction task involves the renovation of a listed building in downtown Munich. The renovation is divided into several construction phases. The following list of services relates to ventilation work in the box area.
Core quantities:
- Relocation of the existing ventilation device (supply and exhaust air device), air output 2,000 m
- Air duct installations including fittings, up to 500 mm: 130 m
- 4 duct silencers,
- 4 fire dampers,
- 12 ventilation grilles,
- Condensation water insulation 18 m
- Duct thermal insulation 20 m
The construction task involves the renovation of a listed building in downtown Munich. The renovation is divided into several construction phases. The following list of services relates to ventilation work in the box area.
Core quantities:
- Relocation of the existing ventilation device (supply and exhaust air device), air output 2,000 m
- Air duct installations including fittings, up to 500 mm: 130 m
- 4 duct silencers,
- 4 fire dampers,
- 12 ventilation grilles,
- Condensation water insulation 18 m
- Duct thermal insulation 20 m