Reinforcement of surface courses and major repairs with asphalt materials of 1st, 2nd and 3rd category departmental roads - 2024 program - 2 lots
territorial unit of Le Blanc- Milling with recycling: 112,749 square metres
- Tack layer: 165,383 square metres
- gB 0/14 Class 3 recycled at 50% Warm: 748 tonnes
- 20% recycled Class 1 bBTM 0/10 Modified Hot Binder: 4,839 tonnes
- bBSG 0/10 Class 3 recycled to 30% Warm: 7,151 tonnes
- bBMA 0/10 Class 3 recycled at 20% Modified Hot Binder: 3,400 tonnes
- bBSG 0/10 Class 3 recycled to 10% Hot Binder modified: 2,476 tonnes
The deadline for the execution of the work is set at 3 months, including 1 month of preparation period
territorial unit of Vatan- Milling with recycling: 47,505 square metres
- Tack layer: 217,589 square meters
- gB 0/14 class 3 recycled at 50% lukewarm: 420 tonnes
- bBSG 0/10 Class 3 recycled at 30% Warm: 29,714 tonnes
- bBSG 0/10 Class 3 recycled at 10% Hot Binder modified: 500 tons
The deadline for the execution of the work is set at 3 months, including 1 month of preparation period