Allocation of bus transport services in the line bundles Saarpfalz-Kreis Nord and Saarpfalz-Kreis West.
Line bundle Saarpfalz-Kreis NordAllocation of passenger transport services in regular service with motor vehicles in the "North" line bundle. The award includes the following lines:
- Line R7: Homburg - Schwarzenacker - Einöd (Saar) - Zweibrücken;
- Line 505: Bexbach - Frankenholz - Höchen - Homburg - University Hospital;
- Line 508: Homburg - Limbach - Altstadt - Niederbexbach - Bexbach;
- Line 538: Homburg - Limbach - Kirkel - Altstadt - Niederbexbach - Bexbach;
- Line 539: Homburg - Erbach - Kleinottweiler - Bexbach;
- ALT line 546: Kleinottweiler - Lappentascherhof - Homburg;
- ALT line 548: Bexbach - Kleinottweiler / Hochwiesmühle outdoor pool;
- Line 566: Bexbach - Frankenholz - Münchwies;
- Line 567: Homburg Hauptbahnhof - Industrie Ost - Bosch Ost;
- ALT night bus route N54: Homburg - Limbach - Bexbach (Höchen);
- The start of operations must take place on 1.8.2021 Operation ends on December 31, 2030.
- The tender documents regulate the details.
Line bundle Saarpfalz-Kreis WestAllocation of passenger transport services in regular service with motor vehicles in the "West" line bundle. The award includes the following lines:
- Line R6: Neunkirchen - Spiesen - Elversberg - St. Ingbert;
- Line R10: Blieskastel - Aßweiler - Airport - Saarbrücken;
- Line 504: Walsheim - Gersheim - Rubenheim - Aßweiler - St. Ingbert;
- Line 506: Webenheim - Blieskastel - Hassel - St. Ingbert - Saarbrücken;
- Line 535: Aßweiler - Niederwürzbach - Blickweiler;
- Line 556: St. Ingbert - Ensheim - Aßweiler - Gersheim;
- Line 557: Gersheim - Erfweiler - Aßweiler - St. Ingbert;
- Line 568: Blieskastel - Aßweiler - Ommersheim - Brebach;
- Night bus route N1: Saarbrücken - Aßweiler - Blieskastel;
- Night bus route N2: Saarbrücken - St. Ingbert - Homburg (- Bexbach);
- Night bus route N51: Eschringen - Reinheim - Blieshaben-Bolchen;
- Night bus route N52: Blieskastel - Niederwürzbach;
- The start of operations must take place on 1.8.2021 Operation ends on December 31, 2030.
- The tender documents regulate the details.