They have to be done
723 m 2 Horizontal 2-layer seal
723 m 2 Clean concrete surfaces from gross contamination
225 m 2 Existing concrete floor surface with grinder
723 m 2 Cleaned raw floor surfaces provided with 1K coating
723 m 2 Measuring the hollow floor grid
723 m 2 Supplying and laying a hollow floor
723 m 2 Extra charge for execution in fire resistance class F30
27 m delivery of a F30 fire barrier made of aerated concrete
780 m edge insulation strip
Rebuilding and extension of the Children's Hospital St. Marienhospital Vechta gGmbH in Vechta.