New construction of
· Building 1b: Staff room on two levels
· Building 4: Heated garage on two levels and flushing hall
· Building 5: Cold and hot storage building and thawing hall
· Building 6: Canopies
· Buildings 7 & 8: Carport
Refurbishment of:
· Building 1a: Storage and staff room as well as raising of the roof and a new floor with technical room
Demolition of:
· Parts of building 1a
· Existing cold storage (to make room for Building 1b)
Other:
· Installation work in building 1.
Earthworks, including:
· Cable and cable laying
· Oil separators and wells
· New surplus surface within the contract
The scope in detail is stated in the tender documents in their entirety.
New construction of
• Building 1b: Staff room on two levels
• Building 4: Heated garage on two levels and flushing hall
• Building 5: Storage building for cold and hot storage as well as defrosting hall
• Building 6: Canopies
• Buildings 7 & 8: Carport
Refurbishment of:
• Building 1a: Storage and staff room as well as raising of the roof and a new floor with technical room
Demolition of:
• Parts of building 1a
• Existing cold storage (to make room for Building 1b)
Other:
• Installation work in building 1.
Earthworks, including:
• Cable and cable routing
• Oil separators and wells
• New overhead area within the contract
The scope in detail is stated in the tender documents in their entirety.