Lot 2.2.II Earthworks TF 7
-1 piece Mobile tire wash system, deliver, put into operation, stock, operate, move and clear again
-2 pcs. daytime construction site on motorway according to D III/1r or D III/2 build, operate, dismantle
-1 pcs. Traffic safety of longer duration on motorway according to D I/2 with TSE, length 1350 m build, operate, dismantle
-approx. 5,000 m2 of insertion of the Rhine bank fortification, transport to the storage area of the Client, unload, transport distance approx. 20 km
-approx. 6,100 m2 of building site, embankments up to 1:2
-approx. 820 m3 of topfloor rentals, apply
-approx. 430 m3 topsoil removal with disposal by the contractor
-approx. 4,300 m3 of underbody removal with disposal by the contractor
-approx. 20,000 m3 gravel removal and recycling by the contractor
-approx. 3,350 m2 asphalt demolition, d = 20 cm with disposal
-2 pcs. Removal of traffic change signs on motorway, transport to the storage area of the AG, transport distance approx. 60 km
-approx. 20 pcs. removal of traffic signs with pipe posts including foundations,
All of the above works are between approx. mid-March 2023 to the end of June 2023.