Execution contract for an air treatment plant/ventilation for Holmen swimming pool.
Asker municipality shall construct a new swimming pool at Holmen in Asker. The building shall have a 25 m long pool with eight lanes, each lane shall be 2.5 m wide (25 x 21 m). In addition there is a therapy pool of 12.5 x 12.5 m and changing rooms, a canteen, gym etc. Emphasis will be put on energy saving measures in the project and the building shall fulfil the passive house requirements for sports buildings.