Project description: Extension and extension of a laboratory building for the pre-clinic of the dental faculty of the University Hospital Tübingen including large rooms for phantom room and technical center. Extension in steel skeleton construction with wall elements made of aerated concrete, extension in solid construction made of reinforced concrete, both parts of the building with flat roof construction.
65m2 copper sheet roof with standing seam covering on on-site substructure with connections to existing copper sheet roof
Copper sheet wall cladding in the parapet area 2x approx. 4.75m2, 1x approx. 16m2